Site Status: A scoping report for a wind farm has been submitted. A wind mast has been erected. Local Authority: Durham County Council
-
We are proposing the construction of between 5 and 9 wind turbines, each with a capacity of around 2 - 3MW.
-
The could provide approximately 18MW of renewable electricity, or enough for up to 11,500 homes.
-
The site would assist in delievering County Durham's 2020 renewable energy targets of 164MW.
-
This electricity will be generated from a renewable energy source with no carbon dioxide emissions.
-
Turbine dimensions are being considered to achieve the optimum balance between energy production and visual impact. Larger turbines will generally produce more energy each year.
-
The wind farm would last for around 25 years, with around 12 months for construction and decommissioning.
-
The grid connection will be to a local substation by overhead cables on wooden poles or by underground cables.
|
|
|
 |