Site Status: A scoping report for all three sites has been submitted
Local Authority: Carlisle City Council
We are proposing the construction of approximately 40 wind turbine, each with a capacity of around 2 - 3MW:
 
  • Stone Chest - up to 10 turbines
  • Black Knors - up to 20 turbines
  • Mossgrove - up to 10 turbines
     
    This could provide up to 80 MW of renewable electricity, or enough for up to 40,000 homes.
     
    The site would assist in delivering Cumbria's 2020 renewable energy targets from all renewable technologies of 292.4 MW (of which 247.5 MW is from onshore wind).
     
    This electricity will be generated from a renewable energy source with no carbon dioxide emissions.
     
    Turbine dimensions are being considered to achieve the optimum balance between energy production and visual impact.  The proposed height of the turbines is 125m to tip.
     
    The wind farms would last for around 25 years, with around 12 months for construction and decommissioning.
     
    The grid connection will be to local substations by overhead cables on wooden poles or by underground cables.

    For further information about our proposals please contact Emily Hooson, Community Engagement Coordinator on 01740 658500 or email emily.hooson@banksdevelopments.com.

  • Scroll up
    Scroll down
    Click to enlarge
    Click to enlarge
     
     
    Registered office: West Cornforth, Ferryhill, County Durham DL17 9EU.
    Registered in England number 2267400. VAT registration number 569 3236 14.

    ©The Banks Group. All rights reserved. For more details see our Terms and Conditions.
    Designed by Guerilla Interactive